1. Proportional valve is unstable – cleaning proportional valve or replacing proportional valve; 2. Damage to the top core bearing – Replace the bearing; 3. Guide rail wear – replace or repair the rail; 4. Paper core deformatio……
1. Proportional valve is unstable – cleaning proportional valve or replacing proportional valve; 2. Damage to the top core bearing – Replace the bearing; 3. Guide rail wear – replace or repair the rail; 4. Paper core deformatio……
The rewinder is the last process in the papermaking process. The performance of the rewinder determines the quality of the finished paper roll. A complete rewinder must have the following properties: 1. Adjusting mechanism of pressure of the platen……
1, The Platen Roller First, in the rewinder system, the platen roller has a significant impact on the tightness control of the paper roll. Among them, the pressure adjusting mechanism plays a role of keeping the pressure of the paper roll and the s……
1. Stretching device 2. support roller 3. unloader 4. transmission mechanism
In the mechanical system of the winder, the slitting mechanism is a very important part of the winder. In order to ensure a straight and smooth cutting edge, the quality control of the finished paper roll plays an important role in ensuring the vol……
In the rewinder system, we installed the paper roll on the paper exit frame. In order to ensure that the width of the sides of the paper web is the same, we should be moving the seasoning when the paper roll is ejected. But the paper roll in the ne……
Firstly, the switch is automatically turned on, and then the paper is positioned to automatically unload the paper. After the unloading is completed, the main operation uses the box rule to measure the size of the rolled paper and observe the trimm……
1. The main operation starts the power-on signal and enters the roll paper state. 2. First set the information (length, diameter) of the paper roll to be rewinded. The tightness of the paper roll adjusts the amount of tension. 3. Generally, the sta……
1.The main operator passes the inspection to confirm that the paper core and the size of the paper cut are correct. The power-on signal informs the operator to prepare the paper. Open the paper feed roller, blower system, and paper positioning syst……
(1.) post operator 1. First check the cutting distance of the measuring cutter, which is consistent with the specifications required by the process standard. 2. Before placing the paper core, first check whether the paper core used meets the requir……
1. The crane operator and the rewinding personnel first check whether the information on the parent roll tracking slip on the base paper meets the requirements of the technical standards, specifications and specifications. 2. Check whether the labe……
1. The operator arrived at the post 10 minutes in advance. 2. Check and understand the operation of the equipment, check equipment hazards, check equipment hygiene and on-site hygiene, and make a good inspection record. 3. Understand the production……